OIL & GAS
Oil and Gas
Hider
Used in fire hydrants, it allows water to flow out of multiple water pipes and is controlled by valves to extinguish the fire.
Procedure for Fabricate Hider
Step 1: Welding and X-ray 100%
Step 2: Painting
Step 3: Packing and Delivery
Please contact us to discuss any query!!!
![]() |
|---|
![]() |
![]() |
![]() |
![]() |
![]() |
|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Skid Structure
A skid is a low steel-framed platform like structure over which heavy equipment is placed to facilitate easy movement and storage. It is constructed from I-beams, angles or channels and used as a shipping and support platform for various types of equipment.
Procedure for Fabrication Skid Structure
Step 1: Marking & Cutting Material
Step 2: Fit up and welding
Step 3: Blasting and painting
Step 4: Installation
Please contact us to discuss any query!!!
Piping
Piping is a system of pipes used to convey fluids (liquids and gases) from one location to another. A piping system is generally considered to include the complete interconnection of pipes, including in-line components such as pipe fittings and flanges.
Procedure for Fabricate Piping System
Step 1: Welding and X ray 100%
Step 2: Cleaning with acid and painting (if needed)
Step 3: Installation and testing pressure
Please contact us to discuss any query!!!
![]() |
|---|
![]() |
![]() |
![]() |
![]() |
CONTACT
Our Location
Lot 5187-B,
Kawasan Perindustrian Balakong Jaya,
43300 Seri Kembangan,
Selangor.
Tel
Tel: 010-815 3393 (Office)
013 - 207 1707 (Yewson)